Project tools
Project Cost Estimator
Add up the cost of your timber and materials, with an allowance for waste and the option to include VAT.
Add your materials, get a running total. Type each item like a shopping list — the total, VAT and waste allowance update as you go.
Quick start
- Name each line for what you're buying — for example “CLS studs 47×100” or “OSB3 sheets”.
- Enter the quantity. Use whatever unit suits the line (pieces, sheets, packs) — just be consistent within that line.
- Enter the price for one unit, before VAT, in pounds.
- Use the waste % buttons to add a cutting allowance to every line, and the + Add a line button to build your list.
What each thing means
- Material
- A label so you recognise the line — it doesn't affect the maths. Type anything that helps you.
- Quantity
- How many units you're buying. The price is multiplied by this number.
- £ each
- The cost of one unit, before VAT. If a merchant quotes per metre, work out the price per piece first.
- Waste allowance
- Adds a percentage on top of every line to cover offcuts and mistakes — you always lose a little when cutting. 10% is a sensible default; 0% turns it off.
- Include VAT
- Switches the grand total between with and without 20% VAT. Always enter your prices before VAT and let this toggle add it.
Edit any line, or add and remove lines below. Nothing is saved — take a screenshot if you want to keep a copy.
Waste allowance
VAT
£211.75
£191.40
£99.00
Total (before VAT)
£502.15
3 lines · 10% waste allowance
Get better results
- Don't forget the small stuff — screws, nails, glue and fixings add up fast, even on a simple build.
- Buying by the pack, pallet or bundle is often cheaper than odd numbers of pieces — round up where it helps.
- To keep or share a quote, take a screenshot. Nothing is saved, so your figures stay private.
- Comparing merchants? Make sure every quote is on the same basis (all with VAT, or all without) before you judge.
Reading the numbers
Each line shows quantity × price, plus your waste allowance. The big total adds every line together, then adds VAT if you've switched it on. Figures are rounded to the nearest penny for display.
Not a substitute for structural sign-off
This is a quick materials estimate, not a full quote. It doesn't include delivery, tool hire, scaffolding, waste disposal or trade discounts. For anything you're committing money to get a written quote — and for structural work, professional sign-off.